Home Renovations in Broomall, PA
Broomall's 1950s–1960s ranches and split-levels have low ceilings, chopped-up rooms and shallow original footings. Opening them up takes new beams and sometimes new footings, which we plan before walls come out. We handle the drawings, the local permits and the build, and price your project at a free on-site walkthrough.
Build your estimateHome renovations for Broomall homes
Broomall is full of 1950s–1960s ranches and split-levels with low ceilings and shallow original footings.
- Split-level walls replaced with beams and posts sized for the span.
- Ceiling heights reworked where the framing allows.
What affects projects in Broomall
- Split-level framing often needs new beams and footings before walls come out.
- Sloped yards behind many Broomall homes make walkout additions and raised decks practical.
Marple Township split-levels and colonials
Broomall's housing is largely mid-century split-levels and 1970s colonials on generous lots. Those lots are the opportunity: there is usually room for a rear family-room addition, a garage conversion, or a full outdoor living build without fighting the setback line.
Permits & local rules in Broomall
Plans are reviewed by the Marple Township code office. We file and track every permit for you.
- Step 1. Zoning review: setbacks, lot coverage and height limits set by Broomall's local zoning rules.
- Step 2. Building permit filed with the township or borough code office serving Broomall (Pennsylvania Uniform Construction Code), using our in-house drawings.
- Step 3. Separate electrical, plumbing and mechanical permits when systems are replaced.
- Step 4. Structural review for wall removals and new beams.
- Step 5. Rough-in inspections before walls are closed, then a final inspection.
Exact requirements depend on your property. We confirm them with the local office at your walkthrough.
How your home renovation gets built
Every step, start to finish, handled by one design-build crew.
- 1Week 1
Walkthrough & scope
We walk the whole house, note structure, systems, and what you want changed.
- 2Weeks 2–6
Drawings & permits
In-house plans, engineering where needed, and township permit filing.
- 3Weeks 6–10
Demo & structure
Protected work zones, selective demolition, framing and structural repairs.
- 4Weeks 10–14
Systems rough-in
Electrical, plumbing, HVAC, and insulation, inspected before walls close.
- 5Weeks 14–22
Finishes
Drywall, flooring, millwork, cabinetry, tile, and paint.
- 6Final week
Final walkthrough
Punch list, final inspections, and a clean handoff.
Build your home renovation estimate in Broomall
Your project scope and material selections help us prepare for your free on-site walkthrough.
