The Main Line, PA

    Home Renovations on the Main Line

    Renovating a 1900s–1940s Main Line stone colonial or Tudor means working with plaster walls, deep stone foundations and decades of past updates. We keep the character that makes these homes valuable while bringing systems up to date. We handle the drawings, the local permits and the build, and price your project at a free on-site walkthrough.

    Build your estimate

    Home renovations for Main Line homes

    Main Line homes are often 1900s–1940s stone colonials, Tudors and estates with plaster walls and deep stone foundations.

    • Original trim, doors and millwork protected or matched where walls change.
    • Wiring and plumbing replaced with routes planned around thick plaster and stone.

    What affects projects on the Main Line

    • Several Main Line neighborhoods fall under historic review, which can add a design approval step before the building permit.
    • Mature trees and steep lots often bring tree protection and grading review into the plan.

    Additions that read as original

    Main Line architecture is unforgiving — Tudor half-timbering, Colonial Revival cornices, Wissahickon schist, slate roofs, and true divided-light windows. A new wing that misses the brick coursing, the mortar color, or the roof pitch announces itself forever. We source matching stone and millwork, replicate trim profiles, and detail the transition so the addition is invisible from the street.

    Permits & local rules on the Main Line

    Plans are reviewed by the Lower Merion, Radnor or Tredyffrin code office, depending on your address. We file and track every permit for you.

    1. Step 1. Zoning review: setbacks, lot coverage and height limits set by the Main Line's local zoning rules.
    2. Step 2. Building permit filed with the township or borough code office serving the Main Line (Pennsylvania Uniform Construction Code), using our in-house drawings.
    3. Step 3. Separate electrical, plumbing and mechanical permits when systems are replaced.
    4. Step 4. Structural review for wall removals and new beams.
    5. Step 5. Rough-in inspections before walls are closed, then a final inspection.

    Exact requirements depend on your property. We confirm them with the local office at your walkthrough.

    How your home renovation gets built

    Every step, start to finish, handled by one design-build crew.

    1. 1Week 1

      Walkthrough & scope

      We walk the whole house, note structure, systems, and what you want changed.

    2. 2Weeks 2–6

      Drawings & permits

      In-house plans, engineering where needed, and township permit filing.

    3. 3Weeks 6–10

      Demo & structure

      Protected work zones, selective demolition, framing and structural repairs.

    4. 4Weeks 10–14

      Systems rough-in

      Electrical, plumbing, HVAC, and insulation, inspected before walls close.

    5. 5Weeks 14–22

      Finishes

      Drywall, flooring, millwork, cabinetry, tile, and paint.

    6. 6Final week

      Final walkthrough

      Punch list, final inspections, and a clean handoff.

    Build your home renovation estimate on the Main Line

    Your project scope and material selections help us prepare for your free on-site walkthrough.

    Project size

    Flooring

    Systems

    Add-ons · choose any

    FAQ

    Home renovations on the Main Line: common questions

    Call Free estimate