Broomall, PA

    Home Additions in Broomall, PA

    Sloped yards behind many Broomall homes make walkout additions practical, with living space on the main level and a usable room below. Shallow original footings mean we check the existing foundation first. We handle the drawings, the local permits and the build, and price your project at a free on-site walkthrough.

    Build your estimate

    Home additions for Broomall homes

    Broomall is full of 1950s–1960s ranches and split-levels with low ceilings and shallow original footings.

    • Walkout rear additions designed to the slope of the yard.
    • Existing footings verified before a second story or tie-in is designed.

    What affects projects in Broomall

    • Split-level framing often needs new beams and footings before walls come out.
    • Sloped yards behind many Broomall homes make walkout additions and raised decks practical.

    Marple Township split-levels and colonials

    Broomall's housing is largely mid-century split-levels and 1970s colonials on generous lots. Those lots are the opportunity: there is usually room for a rear family-room addition, a garage conversion, or a full outdoor living build without fighting the setback line.

    Permits & local rules in Broomall

    Plans are reviewed by the Marple Township code office. We file and track every permit for you.

    1. Step 1. Zoning review: setbacks, lot coverage and height limits set by Broomall's local zoning rules.
    2. Step 2. Building permit filed with the township or borough code office serving Broomall (Pennsylvania Uniform Construction Code), using our in-house drawings.
    3. Step 3. Zoning variance hearing if the addition exceeds setback or coverage limits.
    4. Step 4. Stormwater review when new roof or paved area crosses the local threshold.
    5. Step 5. Footing, framing, rough-in, insulation and final inspections.

    Exact requirements depend on your property. We confirm them with the local office at your walkthrough.

    How your home addition gets built

    Every step, start to finish, handled by one design-build crew.

    1. 1Week 1

      Site visit

      We review lot lines, zoning, and how the addition ties in.

    2. 2Weeks 2–10

      Drawings & zoning

      In-house plans, engineering, and township approvals.

    3. 3Weeks 10–13

      Foundation

      Excavation, footings, and foundation walls.

    4. 4Weeks 13–17

      Framing & roof tie-in

      Walls, roof, windows, and weather-tight shell.

    5. 5Weeks 17–20

      Rough-in & insulation

      Electric, plumbing, HVAC, inspected before drywall.

    6. 6Weeks 20–26

      Finishes & occupancy

      Interior finishes, siding matched to the house, final permit.

    Build your home addition estimate in Broomall

    Your project scope and material selections help us prepare for your free on-site walkthrough.

    Project size

    Foundation

    Exterior

    Add-ons · choose any

    FAQ

    Home additions in Broomall: common questions

    Call Free estimate