Yeadon, PA

    Home Additions in Yeadon, PA

    Additions in Yeadon usually extend a twin or single to the rear, where the lot allows. Borough setbacks and the shared wall line shape what can be built. We handle the drawings, the local permits and the build, and price your project at a free on-site walkthrough.

    Build your estimate

    Home additions for Yeadon homes

    Yeadon is mostly 1920s–1940s brick and stone twins and singles.

    • Rear additions designed to match the home's brick or stone.
    • Finished basements and attics as an alternative where lots are too tight.

    What affects projects in Yeadon

    • Twins share a party wall, which shapes any structural or plumbing work.
    • Sloped rear yards are common, which affects deck heights and stairs.

    Work we've done in Yeadon

    We have built a deck in Yeadon. On these lots a deck usually replaces a worn rear porch or concrete stoop, so footings, ledger attachment to brick, and stairs to a sloped yard are planned carefully.

    Permits & local rules in Yeadon

    Plans are reviewed by the Yeadon Borough code office (or Lansdowne or Darby for those boroughs). We file and track every permit for you.

    1. Step 1. Zoning review: setbacks, lot coverage and height limits set by Yeadon's local zoning rules.
    2. Step 2. Building permit filed with the township or borough code office serving Yeadon (Pennsylvania Uniform Construction Code), using our in-house drawings.
    3. Step 3. Zoning variance hearing if the addition exceeds setback or coverage limits.
    4. Step 4. Stormwater review when new roof or paved area crosses the local threshold.
    5. Step 5. Footing, framing, rough-in, insulation and final inspections.

    Exact requirements depend on your property. We confirm them with the local office at your walkthrough.

    How your home addition gets built

    Every step, start to finish, handled by one design-build crew.

    1. 1Week 1

      Site visit

      We review lot lines, zoning, and how the addition ties in.

    2. 2Weeks 2–10

      Drawings & zoning

      In-house plans, engineering, and township approvals.

    3. 3Weeks 10–13

      Foundation

      Excavation, footings, and foundation walls.

    4. 4Weeks 13–17

      Framing & roof tie-in

      Walls, roof, windows, and weather-tight shell.

    5. 5Weeks 17–20

      Rough-in & insulation

      Electric, plumbing, HVAC, inspected before drywall.

    6. 6Weeks 20–26

      Finishes & occupancy

      Interior finishes, siding matched to the house, final permit.

    Build your home addition estimate in Yeadon

    Your project scope and material selections help us prepare for your free on-site walkthrough.

    Project size

    Foundation

    Exterior

    Add-ons · choose any

    FAQ

    Home additions in Yeadon: common questions

    Call Free estimate