Kitchen Remodeling in Newtown Square, PA
Newtown Square colonials often have a formal dining room and a separate family room. Many owners want one larger kitchen and family space, which usually means removing a wall and rethinking the back of the house. We handle the drawings, the local permits and the build, and price your project at a free on-site walkthrough.
Build your estimateKitchen remodels for Newtown Square homes
Newtown Square has 1970s–2000s colonials on larger lots, plus older farmhouses.
- Kitchen, breakfast and family rooms combined into one open space.
- Islands and pantries sized for the larger rooms these homes allow.
What affects projects in Newtown Square
- Some properties still use septic systems, and new structures must stay clear of the field.
- Larger lots leave room for additions and pools, but new roof and paved area can trigger stormwater planning.
Estate-scale design-build
Newtown Square lots are large enough that projects stop being remodels and become small buildings: detached pool houses with full baths and kitchens, primary-suite wings, three-car garages with second-floor space, and covered outdoor rooms with fireplaces. Those need real drawings, engineering, and a construction schedule — not a napkin sketch.
Permits & local rules in Newtown Square
Plans are reviewed by the Newtown Township code office. We file and track every permit for you.
- Step 1. Zoning review: setbacks, lot coverage and height limits set by Newtown Square's local zoning rules.
- Step 2. Building permit filed with the township or borough code office serving Newtown Square (Pennsylvania Uniform Construction Code), using our in-house drawings.
- Step 3. Electrical and plumbing permits for new circuits, gas lines or relocated sinks.
- Step 4. Range-hood venting and makeup-air rules for larger hoods.
- Step 5. Rough and final inspections.
Exact requirements depend on your property. We confirm them with the local office at your walkthrough.
How your kitchen remodel gets built
Every step, start to finish, handled by one design-build crew.
- 1Week 1
In-home measure
We measure the space, talk through how you cook and your budget.
- 2Weeks 2–3
Layout & drawings
In-house layout, cabinet plan, and any wall or beam engineering.
- 3Weeks 3–8
Permits & ordering
Township permits filed; cabinets and long-lead items ordered before demo.
- 4Weeks 8–10
Demo & rough-in
Tear-out, then plumbing, electrical, and lighting moved where needed.
- 5Weeks 10–13
Cabinets & counters
Cabinet install, then counters templated and set.
- 6Weeks 13–14
Tile, trim & walkthrough
Backsplash, fixtures, appliances, final inspection.
Build your kitchen remodel estimate in Newtown Square
Your project scope and material selections help us prepare for your free on-site walkthrough.
